An update on my house's plumbing situation: First, the insurance company finally called us back - on Friday, though! It took them over three days to get back to us on a problem that was going to get more and more expensive the longer it took to get started on a "real" cleanup. Idiots...
So the first contractors finally showed up Friday about mid-day. It was the "remediation company". Apparently their responsibility is to assess the water damage and then perform the water cleanup. The contractor started his investigation, thinking it wasn't too bad (we *had* cleaned up quite a lot in three days, you know?), but later on said, "Well, this is much worse than I thought." Duh....
The net was: The floor in the bathroom upstairs (tile) will likely need to be removed, the cabinet pulled out; the floor just outside of that bathroom will need to be dried out with their special drier; the carpet there will probably need to be replaced; unbeknown to us, the water had also made its way into the floor in my daughter's room so that will need to be dried out. On the first floor of the house: the linoleum will need to be removed; the soffets will need to be removed; the cabinets (at least some of the) will need to be removed and probably replaced; the sub-floor will probably need to be replaced; the floor in the toy room and family room will need to be dried and the carpets replaced; we will have to have the ductwork all cleaned to ensure moisture is removed.
Looks like we will be staying in a hotel at least for about a week while this goes on because there will be no access to the kitchen. My hope is that the hotel stay will only be necessary during the clean up and not the construction.
As for the construction - that will be separate contractor. It's still not clear how this all works in terms of identifying the cost and approving.
We also need to put together a list of the items destroyed by the flood for reimbursement. That's going to be a big part of today.
In the midst of all of this, I haven't managed to get in a run since my road race on Monday :-(. My soccer team has their first game of the session tonight, which I'm planning to try to play even with my bum knee (which hasn't been bugging me as much for the last few weeks!).
Subscribe to:
Post Comments (Atom)
1 comment:
On the first floor plumbing supplies of the house: the linoleum will need to be removed; the soffets will need to be removed.
Post a Comment